Thursday, April 25, 2024
HomeTelanganaTSPB Inaugurates Electro Coagulation Technology-based Sewage Treatment Plant

TSPB Inaugurates Electro Coagulation Technology-based Sewage Treatment Plant

Hyderabad:  Telangana State Planning Board (TSPB), Vice -Chairman B. Vinod Kumar today inaugurated the advanced Electro Coagulation Technology-based Sewage Treatment Plant (E-STP)of 50 KLD capacity at the campus of Dr MCR HRD Institute on Friday, in the presence of  B.P. Acharya, IAS, Special Chief Secretary & Director General, Dr MCR HRD Institute. This initiative is a significant step towards making the Institute an ecologically responsible and environment-friendly institution.

The E-STP process not only provides treated water of an excellent quality suitable for reuse for gardening but also consumes lesser power, generates far lesser solids than conventional systems, occupies the lesser area, and is extremely easy to operate and maintain.

In addition, the E-STP process provides for a number of other advantages, which includes a switch on switch off the system, No Aeration / Blower needed, Instant Treatment of wastewater, etc.
The E-STP was executed by Telangana State Police Housing Corporation Ltd and constructed by M/s. Green Ecowater Systems (ISO 9001; 2015 Certified), Hyderabad. (NSS)